CONTRACTOR |
WORK DESCRIPTION |
|
PEMEX EXPLORATION AND PRODUCTION |
Characterization, control and consolidation of the fractures of natural hydrocarbons emerging in the active production camps of Altamira , and area of Cerro Azul-Naranjos. |
|
PEMEX REFINING |
Restoration of the ground in the impacted area due to the environmental contingency of the days 10 th and 11 th of September of the 2002, caused by the overflow of the industrial drainage in the area of outflow, causing contamination in lands of cultivation that abut since the south wall of the refinery up to the property land of Mrs. Lozano Silva, located south of the Ing. Hector R. Lara Sosa refinery. |
|
PEMEX EXPLORATION AND PRODUCTION |
Restoration and covered of the prey located in the assets of production of Altamira , and area of Cerro Azul-Naranjos. |
|
PEMEX EXPLORATION AND PRODUCTION |
Restoration of the affected areas because of the spills (accidental leaks) in the assets of production of Altamira , and area of Cerro Azul-Naranjos (Area of Chicontepec) . |
|
|
|
|